• 0800 787 472

Cart
Menu Close

The CAB Building

Application of Peel Away 1

Peel Away 1 being used on the CAB Building High Rise Project to encapsulate the removal of lead based paint of the steel structure prior to safely undertaking structural welding to eliminate fumes and dust into the environment.